Just finished a complete remodel

January 21st , 2010

Just finished a complete remodel to a Master Bathroom and Powder Room in Snohomish County. The house is a unique log home and provided a number of challenges from both the design and construction standpoint. The existing sheetrock was removed and replaced with tongue in groove planking and stained to match the existing ceiling. The former toilet/bidet area was transformed into a large custom shower using our new TruStone Breccia Paradiso product and a distinctive heavy glass frameless shower enclosure. The area previously occupied by an enormous jetted tub was replaced with a double sink vanity and cabinetry providing lots of needed storage space. New heated tile flooring provided the finishing touch. The change from the Before photo is pretty dramatic. The homeowners were delighted with the transformation to their bathroom and the fact that we completed the project at a signicant cost savings compared to other bids they had received. They plan on having us remodel two more bathrooms this spring.blog-photo-Jan-21-2010-3

blog-photo-Jan-21-2010-2

blog-photo-Jan-21-2010-1